The Skilled Trades Shortage Isn't Going Away. Contractors Need a Different Strategy
By
Cameron Renaud
·
4 minute read
There's a strange problem happening in construction right now.
There is work.
There are projects.
There is demand.
But a lot of contractors still can't find enough people to do the work.
That creates a frustrating situation for business owners.
You can win the job.
You can have the customer.
You can have the materials.
You can have the equipment.
But if you don't have enough skilled people, none of it matters.
Labour shortages and labour costs continue to be major issues across both the Canadian and US construction markets. Industry forecasts for 2026 continue to point to tight skilled-trades labour markets and pressure on project margins.
So what can a contractor actually do about it?
The answer probably isn't simply:
"Hire more people."
The Problem Is Bigger Than Hiring
If there were ten qualified electricians, plumbers, HVAC technicians or other skilled workers sitting around waiting for a job, hiring would be easier.
That's not the environment many contractors are operating in.
Canada's construction workforce is facing a long-term replacement challenge as experienced workers retire and the industry works to bring new workers into the trades. Gallagher's 2026 Canadian construction outlook notes that labour costs, skills availability and worker availability remain top concerns.
The US is facing similar pressure.
That means contractors need to think about another question:
How much more can I get from the people I already have?
Not by working them harder.
By wasting less of their time.
Your Most Expensive Employee Might Be Waiting
Think about what happens when a field employee loses 30 minutes because:
- The schedule wasn't updated
- They couldn't find the job information
- They had to call the office
- A material wasn't ready
- They didn't know where to go next
- Someone entered the wrong address
- They had to return to the shop for paperwork
Thirty minutes doesn't sound like much.
Now multiply it.
Five employees.
Five days.
Four weeks.
That's 50 hours a month.
That's more than a full workweek of labour that produced nothing for the customer.
And that's assuming the wasted time is only 30 minutes.
Construction Productivity Isn't Just About Working Faster
This is an important distinction.
You don't necessarily need your employees to work faster.
You need them to spend more of their working day doing work that actually matters.
There is a difference between:
productive time
and
time spent dealing with the business.
A technician installing equipment is productive.
A technician sitting in a truck trying to figure out what job comes next isn't.
A project manager solving a field problem is productive.
A project manager searching through five spreadsheets to find the latest information isn't.
Where Better Systems Help
Technology won't replace skilled tradespeople.
That's not the point.
Technology can help remove some of the administrative friction around them.
For example:
Scheduling
Everyone should know where they're supposed to be and when.
Time Tracking
You should know when employees start, stop and how their time is being allocated.
Job Information
Field employees should be able to access the information they need without calling the office every time.
Materials
The office should know what's needed before a crew discovers it isn't there.
Project Updates
Managers should be able to see what's happening without constantly calling the field.
Reporting
Owners should be able to identify where labour is being consumed.
These sound like small improvements.
Across hundreds of jobs, they're not.
The Hidden Cost of Poor Communication
One of the biggest productivity problems in construction isn't a lack of effort.
It's information moving badly.
The office knows one thing.
The project manager knows something else.
The technician has a different version.
The customer has another.
Then someone sends a text.
Then someone updates a spreadsheet.
Then someone forgets to update the spreadsheet.
Now you've got five versions of reality.
The work still gets done.
It just costs more to get there.
The Contractor With 20 Employees Doesn't Have 20 Employees
This might sound strange.
But consider this:
If you have 20 employees and every employee loses 20 minutes a day because of avoidable administrative problems, that's more than 33 hours of lost time every week.
That's almost another full-time employee disappearing into inefficiency.
You didn't lose anyone.
You just lost the capacity.
That's why operational efficiency matters so much in a tight labour market.
What Should Contractors Measure?
If you're trying to get more productivity from your existing workforce, start tracking a few basic numbers.
Labour Hours Per Job
How many hours did you estimate?
How many did you actually use?
Revenue Per Labour Hour
How much revenue is the business generating relative to the labour being used?
Overtime
Where is overtime occurring?
Is it unavoidable or is it being caused by scheduling and workflow problems?
Rework
How often are employees returning to a job because something wasn't done correctly the first time?
Travel Time
How much time are employees spending moving between jobs?
Administrative Time
How much time does your office spend entering, transferring and looking for information?
These numbers can reveal problems that aren't obvious from your revenue.
The Best Contractors May Not Be the Ones With the Most People
A contractor with 50 employees isn't automatically more efficient than one with 20.
The question is:
How much productive work can each person accomplish?
That is becoming increasingly important as labour becomes harder and more expensive to find.
And this is where digital tools become less of a luxury.
They're becoming infrastructure.
This Is Why We Built Tradetraks
Tradetraks isn't designed to solve the skilled trades shortage.
No software can do that.
What it can do is help contractors get more organized around the people they already have.
Scheduling.
Projects.
Employee management.
Time tracking.
Equipment.
Materials.
Safety.
Financial information.
When those areas are connected, contractors can spend less time asking:
"Where is that information?"
and more time asking:
"What should we do about it?"
That's a much better problem to have.
A Simple Exercise for Your Business
This week, pick one employee.
Don't evaluate how hard they work.
Instead, track their day.
Ask:
How much time did they spend doing work for the customer?
Then ask:
How much time did they spend dealing with everything around the work?
You might be surprised by the answer.
Then do the same thing with your office.
How much time is being spent:
- Entering information
- Finding information
- Calling employees
- Updating schedules
- Fixing paperwork
- Tracking hours
- Chasing approvals
- Looking for job details
Those hours are part of your labour cost too.
The Labour Shortage Changes the Question
For years, contractors could respond to growth by hiring.
Need another crew?
Hire one.
Need another project manager?
Hire one.
Need another technician?
Find one.
That's getting harder.
The better question increasingly becomes:
How can I increase the capacity of the team I already have?
Better scheduling.
Better communication.
Better information.
Better job costing.
Better visibility.
None of these replace skilled workers.
They help skilled workers spend more of their time doing what they're actually good at.
And that may be one of the biggest competitive advantages a contractor can build over the next few years.
Want to see what that looks like in practice?
Tradetraks brings scheduling, projects, employee management, time tracking, materials, equipment and financial information together in one platform built for trade businesses.
See what Tradetraks can do for your business →
Learn more at https://www.tradetraks.ca or book a free demo today.